You don't have javascript enabled. Good luck with that.
Pencarian
Parkir Liar, 12 Mobil Diderek Petugas

12 Vehicles Towed Due to Illegal Parking

Although we're routinely holding the operation, it never gives deterrent effect

The ranks of East Jakarta Transportation Sub-Department have towed 12 vehicles and then brought to the Goods Public Transport Terminal and Pulogebang Pool. The owners will be charged a fine of Rp 500 thousand per day. 

East Jakarta Transportation Sub-Department Head, Bernad Octavianus Pasaribu disclosed his party also removed tire valves of 22 cars and 1 motorcycle, as well as ticketed 20 public transports and 1 box car. They were controlled due to illegal parking. 

City Receives Rp 238 M During Illegal Parking Raid

"Although we're routinely holding the operation, it never gives deterrent effect. Whereas, we had towed some vehicles today plus fine as much as Rp 500 per day," he expressed, Wednesday (2/25).

Those vehicles that have been towed are found along Jalan Pemuda (4 vehicles). They are Kijang Innova B 1899 UOX, Kijang Super B 2318 ML, Toyota Yaris B 1634 KKQ and Nisan Serena B 8507 BE.

There are also on Jalan Paus, Jalan Jatinegara Timur (2 vehicles, Jalan Bekasi Timur (2 vehicles), Jalan Persahabatan Utara and Jalan Balai Pustaka.

As for the ticketed vehicles consist of 2 bajajs, 8 KWK public minivans, 3 Metromini minibuses, 3 taxis, 3 box cars, and 1 AKAP bus. They were netted due to stop in a forbidden area and paralyzed traffic flow.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1304 personFolmer
  4. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati
  5. MRT Phase 2A Northbound Tunnel Excavation Completed

    access_time09-07-2026 remove_red_eye845 personAldi Geri Lumban Tobing